New Construction of a 25,000 sq ft office and warehouse building for the growing company. Project included reception area, conference room, offices, break room, restrooms, lockers, 2 warehouse areas along with loading docks and paving.
A new Perryville police headquarters was completed in 2009, including a call center with bullet proof glass, offices, holding cells, officer and investigator training rooms, and evidence rooms. The 10,860 square feet building started construction in January 2008 with the demolition of the old city hall, and was completed in January, 2009.
Renovations included installing a new skylight above the altar as well as the altar backdrop, refinishing and replacing all the pews, new flooring throughout, new lighting, new baptismal fountain, and converting the ‘cry room’ into an open integrated part of the sanctuary that would allow for additional seating as needed. An addition was also added
This 90,000 sq ft project is a new Primary Center that will have educational facilities for grades Pre-K thru 2nd grade. The main floor is approx. 54,000 sq ft with 20 classrooms, a media center, music and art rooms, and 4 large collaboration spaces. The main floor also includes the administration offices, and full-service kitchen/cafeteria
This building is a 29,000 square foot office and warehouse for the growing company. Project included reception area, conference room, offices, break room, restrooms, lockers, 2 warehouse areas along with loading docks and paving.
Design and build contract to complete an 8,667 square foot, modern, full-service banking location in Cape Girardeau, Missouri. Our team worked closely with First Midwest Bank from start to finish.
Phase 2 of the Jackson R-2 High School Building Program in Jackson, Missouri. The addition is 66,000 sq ft. and houses business, foreign language, and special education classrooms. Also included are a new administration office, media library, computer labs, and broadcast journalism studio.