Construction consisted of a 46,000 square feet addition to the front of the existing school that included classrooms and a large library.  The addition connected three separate buildings, each at a different elevation.  Also included in the project was the addition of two enclosed corridor links, one complete with an elevator.  Finally, a new bus lane, parent pick up lane, and parking lot were constructed to ease traffic flow.